logo

CP Addison Street Bridge (Irving Park)

Through Plate Girder Bridge over W. Addison Street
Irving Park, Chicago, Cook County, Illinois

Click the Photo Above to See All Photos of This Bridge!
Name CP Addison Street Bridge (Irving Park)
Built By Chicago, Milwaukee & St. Paul Railroad
Contractor Lassig Bridge & Iron Works of Chicago
Currently Owned By Canadian Pacific Railway
Length 75 Feet Total
Width 2 Tracks
Height Above Ground 13 Feet 10 Inches
Superstructure Type Through Plate Girder
Substructure Type Concrete
Date Built 1898
Traffic Count 100 Trains/Day (Estimated)
Current Status In Use
MILW Bridge Number A-30
Significance Local Significance
Documentation Date July 2018
In 1873, the Milwaukee & Saint Paul Railroad completed a mainline between Milwaukee and Chicago, two key port cities.

The line became part of the Chicago, Milwaukee & Saint Paul by 1874, which was vastly expanding its empire across the midwest. It had already reached into Iowa and Minnesota, along with extensive networks in Wisconsin and Illinois.

The line was double tracked in the late 1880s and early 1890s, and was part of the Milwaukee to Saint Paul mainline.

The CMStP reorganized into the Chicago, Milwaukee Saint Paul & Pacific in 1912, as it began expanding its empire towards Seattle.

This line saw some of the most stable traffic of the Milwaukee Road, which generated trains day and night.

When the Milwaukee Road fell out of buisness in 1985, it became part of the Soo Line, who eventually dissolved its Wisconsin lines. Most of the Soo Line went to Canadian Pacific, including this line. Canadian Pacific later sold lines off to Wisconsin Central. This line was not included.

Canadian Pacific is the current operator of this line, which sees nearly 110 trains per day, and is the main route from Chicago to Saint Paul with the Amtrack. It is known as the C&M Subdivision.
07/17/21


Located in the Irving Park neighborhood of Chicago, this through girder bridge crosses West Addison Street near N. Kilbourne Avenue.
Built in 1898, the bridge features a single through girder span, set onto concrete substructures.
As one of the earliest ordered track elevations in Chicago, this bridge and the others in the area feature steel structures. The concrete substructures on this bridge are unique, as stone was still commonly used at this time.
Overall, the bridge appears to be in fair condition, with minimal significant deterioration. A rehabilitation of this bridge is planned for 2021-2023.

The author has ranked this bridge as being locally significant, due to the common design and large numbers of similar bridges in the area.
The photo above is an overview.

Citations

Source Type

Source

Build Date Chicago Track Elevation Ordinance
Contractor Missing Lassig Bridge & Iron Works plaque
Railroad Line History Source ICC Valuation Information, Compiled by Richard S. Steele



Widget is loading comments...



© Copyright 2010- John Marvig and Contributors. All Rights Reserved